2023 Pebble Grey 144 Sprinter Build

Welding starts for the new design and we start on the shower frame first. We will get it all tack welded up and have the client come back in for a visit before the final welding is then completed.

sprinter-van-conversion-houston-13.jpg


We then move on to the passenger-side base module.

sprinter-van-conversion-houston-11.jpg
sprinter-van-conversion-houston-12.jpg
sprinter-van-conversion-houston-15.jpg


Our module will bolt into the area that directly connects to the factory chassis D-Ring points. Super Strong!!

sprinter-van-conversion-houston-14.jpg
sprinter-van-conversion-houston-10.jpg


We keep an area that the client wanted for access open just enough to enter the vehicle but a dimension that will maximize available counter space.

sprinter-van-conversion-houston-16.jpg
 
Last edited:
Time to cut the window areas out.

sprinter-van-houston-1.jpg
sprinter-van-houston-2.jpg
sprinter-van-houston-3.jpg
sprinter-van-houston-4.jpg
sprinter-van-houston-5.jpg
sprinter-van-houston-6.jpg

sprinter-van-houston-7.jpg


After adding the edge moulding we prep and install the windows.

sprinter-van-houston-8.jpg
sprinter-van-houston-9.jpg
sprinter-van-houston-10.jpg
 
Back
Top